plumbing diagram (third revision) for the bio boulevard digester & water molecule public art concepts for the brightwater treatment facility in woodinville, washington.
my role: 3D modeling & rendering, concept illustration, pre-visualization, technical drawings
clients: buster simpson-artist/designer
3D modeling & rendering • concept illustration • publication layout • web design • production art • logos & branding
Monday, August 28, 2006
Wednesday, August 16, 2006
walla walla bound: instrument implement & poetic license • proposal layout & technical drawing
four pages from the revised proposal layout for the walla walla bound: instrument implement & poetic license public art project in walla walla, washington.
Role: 3D modeling & rendering, proposal, technical drawings, copy editing
Clients: buster simpson–artist/designer
walla walla bound: instrument implement • 3D model & renderings
further revisions to the 3D model & renderings for the proposed walla walla bound: instrument implement public art project in walla walla, washington.
Role: 3D modeling & rendering
Clients: buster simpson–artist/designer
Tuesday, August 15, 2006
brightwater • 3D model, renderings (work in progress) & technical drawing
plumbing diagram (second revision) for the bio boulevard digester & water molecule public art concepts for the brightwater treatment facility in woodinville, washington.
my role: 3D modeling & rendering, concept illustration, pre-visualization, compositing, technical drawings
clients: buster simpson-artist/designer
my role: 3D modeling & rendering, concept illustration, pre-visualization, compositing, technical drawings
clients: buster simpson-artist/designer
Subscribe to:
Posts (Atom)











