Wednesday, August 29, 2007

flamingo arroyo trail: shade structures & gateways • 3D model & renderings (work in progress)

revisions for the shade structure and gateway concepts for the flamingo arroyo trail in las vegas, nevada.


my role: 3D modeling & rendering, concept illustrations, pre-visualization
clients: buster simpson, barbara grygutis & kevin berry – artists/designers

Friday, August 24, 2007

flamingo arroyo trail: pedestrian bridges • 3D model & renderings (work in progress)

hoop dance bridge concept proposed for the flamingo arroyo trail in las vegas, nevada.


my role: 3D modeling & rendering, concept illustrations, pre-visualization
clients: buster simpson, barbara grygutis & kevin berry – artists/designers

flamingo arroyo trail: shade structures • 3D model & renderings (work in progress)

revisions for the shade structure with outhouse concept for the flamingo arroyo trail in las vegas, nevada.


my role: 3D modeling & rendering, concept illustrations, pre-visualization
clients: buster simpson, barbara grygutis & kevin berry – artists/designers

Thursday, August 9, 2007

flamingo arroyo trail: kiosk • 3D model & renderings (work in progress)

kiosk concept for the flamingo arroyo trail in las vegas, nevada.


my role: 3D modeling & rendering, concept illustrations, pre-visualization
clients: buster simpson, barbara grygutis & kevin berry – artists/designers

Tuesday, August 7, 2007

walla walla bound: instrument implement • 3D model, renderings & compositing

renderings of the 3D model composited into site photos showing walla walla bound: instrument implement at the water & environmental center, walla walla community college, walla walla, washington.

Role: 3D modeling & rendering, concept illustration, pre-visualization, compositing
Clients: buster simpson–artist/designer