Saturday, September 24, 2011

brightwater • completed & installed artwork

photos of the finished bio boulevard digester & water molecule during the dedication at the brightwater treatment facility in woodinville, washington.

photos: todd metten

my role (during the entire project): 3D modeling & rendering, concept illustration, pre-visualization, technical drawings, production/fabrication files, layout, copy editing, compositing, photo editing, flash programming, photography

clients: buster simpson-artist/designer