further revised 3D model, renderings & technical drawings for walla walla bound: instrument implement at the water & environmental center, walla walla community college, walla walla, washington.
Role: 3D modeling & rendering, technical drawings
Clients: buster simpson–artist/designer
3D modeling & rendering • concept illustration • publication layout • web design • production art • logos & branding
Tuesday, April 3, 2007
Wednesday, March 28, 2007
flamingo arroyo trail: pedestrian bridges • 3D model & renderings (work in progress)
mesh refinements on the serrated bridge concept proposed for the flamingo arroyo trail in las vegas, nevada.
my role: 3D modeling & rendering, concept illustrations, pre-visualization
clients: buster simpson, barbara grygutis & kevin berry – artists/designers
my role: 3D modeling & rendering, concept illustrations, pre-visualization
clients: buster simpson, barbara grygutis & kevin berry – artists/designers
Tuesday, March 27, 2007
flamingo arroyo trail: pedestrian bridges • 3D model & renderings (work in progress)
cross arch bridge and serrated bridge concepts proposed for the flamingo arroyo trail in las vegas, nevada.
my role: 3D modeling & rendering, concept illustrations, pre-visualization
clients: buster simpson, barbara grygutis & kevin berry – artists/designers
my role: 3D modeling & rendering, concept illustrations, pre-visualization
clients: buster simpson, barbara grygutis & kevin berry – artists/designers
Tuesday, March 20, 2007
flamingo arroyo trail: pedestrian bridges • 3D model & renderings (work in progress)
water vessel bridge concept proposed for the flamingo arroyo trail in las vegas, nevada.
my role: 3D modeling & rendering, concept illustrations, pre-visualization
clients: buster simpson, barbara grygutis & kevin berry – artists/designers
my role: 3D modeling & rendering, concept illustrations, pre-visualization
clients: buster simpson, barbara grygutis & kevin berry – artists/designers
Sunday, March 11, 2007
walla walla bound: instrument implement • 3D model, renderings & technical drawing
3D model, renderings & technical drawing for walla walla bound: instrument implement at the water & environmental center, walla walla community college, walla walla, washington.
Role: 3D modeling & rendering, technical drawing
Clients: buster simpson–artist/designer
Role: 3D modeling & rendering, technical drawing
Clients: buster simpson–artist/designer
Sunday, March 4, 2007
flamingo arroyo trail: shade structures & gateways • layout & technical drawings
revised shade structure and gateway concepts for the flamingo arroyo trail in las vegas, nevada.
my role: 3D modeling & rendering, concept illustrations, pre-visualization, layout, technical drawings, copy editing
clients: buster simpson, barbara grygutis & kevin berry – artists/designers
my role: 3D modeling & rendering, concept illustrations, pre-visualization, layout, technical drawings, copy editing
clients: buster simpson, barbara grygutis & kevin berry – artists/designers
flamingo arroyo trail: shade structures • 3D model & renderings (work in progress)
revised shade structure concept for the flamingo arroyo trail in las vegas, nevada.
my role: 3D modeling & rendering, concept illustrations, pre-visualization
clients: buster simpson, barbara grygutis & kevin berry – artists/designers
Subscribe to:
Posts (Atom)


























